¶
Legend
Manufacturing
Assembly
Integration
Verification
Done
In progress
Cancelled
Other (LOG, ...)
Operations
Review
¶
Diagram
Integrate DPR with TF
Functional Testing of Main Valves
Order Valve Acutators for LV
Plan Operations
Order COPV 10L
Assemble on
test bench
Electrical Testing
Short duration testing
with 1L COPV
(REQ_05, REQ_06, REQ_14)
Write Operations
for high
pressure testing
Testing with full size
COPV and 20l tank
(REQ_01,REQ_07)
Seal manufacturing at ATME
Coldflow testing session 2
Manufacturing of Main Valves
Order PCB
Solder components
Characterisation burns (3s)
(PR_ENIGINE_REQ_02)
Manufacture Test board to measure capacity
Ignition testing
Fuel Tempearture Sensor
Order Plumbing
Assembly of LOX version
Full lenght Burns
(PR_REQ_02)td {border: 1px solid #cccccc;}br {mso-data-placement:same-cell;}
Implement Changes and manufacture second Chamber
Machine Parts of the fill level sensor for pressure testing
Test electronics
Pressure Test
Integrate on test tank of Structures
Assemble Fill level sensor with DPR
Igniter test with glow plug and N2O
Manufacturing of LOX version
Order LOX valves for fligh version
Assemble Test bench version on TF
VSFT(PR_REQ_02)
Reassemble Engine Bay
Bend Tubes for Midbay
Bend Tubes for Pressurant Bay
Integrate Midbay
Integrate Pressurant Bay
Operations of VSFT
Integrate PR, AV, ST
Acceptance SFT of B1V2
Assemble both main Valves
Characterisation of LOX/ETH ignition system
Integrate Avionics and Pressure transducers on TF
Manual Abort Cold Flow Test / Water hammer Test
(PR_REQ_05, PR_REQ_18)
Manual Abort SFT Test
(PR_REQ_05)
Assemble Engine bay
Static chamber Testing
Igniter teat with Spark plug
Propellant Unloading
(PR_REQ_08)
Engine Bay length & mass
(PR_ENGINE_REQ_04, PR_ENGINE_REQ_05)
Fabricat Test setup for burst disk testing
Burst Disk Test
(PR_FLUID-SYSTEM_REQ_13)
Valve Isolation
(PR_FLUID-SYSTEM_REQ_15, PR_FLUID-SYSTEM_REQ_16)
Overpressure Test of Pressure releifs
(PR_FLUID-SYSTEM_REQ_10)
Material Compatibility Test
(PR_FILL-SENSOR_REQ_01- REQ_07)td {border: 1px solid #cccccc;}br {mso-data-placement:same-cell;}
Faulty Sensor
Data Response
(REQ_13)
TRR Propulsion
TRR TF
MPS design
MPS manufacture
Dégazage MPS